Burchell Avenue Over Duck Slough Bridge Replacement

MERCED COUNTY, CA

Project Description
This project involves replacing the existing bridge with a cast-in-place, prestressed concrete slab bridge and replacing approximately 560-feet of Burchell Avenue with Class 2 aggregate base and hot mix asphalt, and rock slope protection. This project also included the extensive work and coordination with MID. The improvements included extension and upgrading multiple MID structures and pipes. This included hundreds of feet of 42” RCP, four stand pipes, a 5’ x 5’ concrete junction box, and a 12’ tall concrete outlet structure with weir blades and concrete ditch lining.

Services Provided
Services include but are not limited to: Documentation of preconstruction conditions, weekly progress meetings and coordination, submittal management and review, RFI management, construction inspection, progress payment estimates, QA material testing oversight, change order negotiation and writing, and project close out including final acceptance.

Project Facts:
Value $7,600,000
| Dates 09/2024-01/2026

Members of the proposed team who worked on this project

Ramon Montes De Oca, PE

Vice President

Dave Cash

Construction Inspector